New Meter Installs/ Siteworks

How can we help?

Whatever the reason for requiring a new meter, our site works team is here to help.

We will manage the process from start to finish, including:

  • Negotiating terms of the supply
  • Arranging pipework and required drawings
  • Site visits
  • Full project management
  • Meter position and installation

 

New connections

New meters can be required out of necessity if the purpose of the building has changed or through choice.

Either way, our team have managed hundreds of new meter installs and we can use this experience to help you make the best decision for your property.

If you have a meter already on site but you require it to be moved or disconnected, we can help with that too!

Upgrade or downgrade

You may be changing the purpose of your building or have taken over a building with a meter in place that is no longer suitable.

We can help to advise on up or down grading your meter to ensure your appliance are the most effective they can be for your use.

Having the wrong meter type can end up costing you money that it doesn’t need to.

Management Capacity

Every electricity meter is set to a certain capacity, based on its requirements when it was installed.

If the electricity usage has changed, you could either be paying too much because too much electricity is passing through your meter, or you could be exposed to a potential health & safety risk if there is not enough capacity for the demand of electricity you are using.

we can help to advise on your capacity and meter management as well as showing you the benefits of technology used as voltage optimization.